At the end of June, 2016 the company was engaged in unloading of railway flat wagons, loading and fastening on automobile transporter of two fire-tube boilers 8MVt. The boilers were manufactured by the company called «Polytechnik», which is situated in
The company was engaged in forwarding of knocked-down crane Terex CC 3800-SL from the 28th to the 29th of April, 2016. The crane’s lifting capacity is 650 tons.